As the best Asian retractable grandstand supplier, we provide our clients FIBA, CE, SGS, TUV Certificates. The related loading calculation, and the Fire Control Requirements were made by the EU and FIBA standards. In addition, we strictly control raw materials, and the produce process, etc. to make sure that all products can meet the clients’ request.

The installation time depend on: the type of seats, the type of grandstands, the QTY of the installing workers, the efficiency of the installing workers, and so on. Please contact with our salesman to confirm the installing time before start the project.

It is 5 years guarantee except man-made damage. During the guarantee period, our salesman will visit our clients regularly to make sure good communication for each other. We also can give the client after sales service throughout its life.

In according to the bid project, we will give the client project authorization and the technical support, on occasion the salesman will go to the site service the client.

Rapid assembly stands is a new type of temporary stands system, which can be used in any combination. The frame body unit adopts the structure of the chrysanthemum scaffold structure, which is composed of 48 types of the structure of the types of chrysanthemum. The company independently developed the layer frame structure. According to the requirements of the 370mm (Ceng Gao) 750mm X (depth), it is composed of a multistage modulus temporary stands. Can collocation low back or middle back injection molding chair, easy to install. The whole module is used for welding the whole module, and can be used to exchange common, high quality carbon non slip pattern steel pedal, each square allows for 350kg, temporary stands up to 30 layers, height of 11 meters, all metal components are treated by galvanized.

Normally our production period is about 40-45 days. In the case of client special request, we will speed up the production progress against the project time table provided before production.

For the diversity of products, we have irreplaceable advantage compared with our competitor: from indoor to outdoor activities of the telescopic seating system, fixed seat, metal bleacher ,can meet different customer requirements. And our products are approved by CE, SGS, and TUV. What’s more important, our products tested by Olympic Games, F1 Grand Prix, Asian Games, Universiade, FIBA, etc.

Our workers and installing workers or engineers are with rich experience. They are familiar with every production chain. For welding workers, they must have the welding certificate.

For different countries and regions, the delivery time is different. Normally, for Southeast area, delivery time is 10-15 days; Middle east is15-18 days;  Africa is 20-25 days; for Europe, the delivery time is 25-30 days; South America or North America, the delivery time is 25-30 days.

If clients want to know the price of certain fixed seat, please give us the DWG drawing, pictures (if it is possible), progress of construction sites. We will estimate whether our seats satisfy with the concrete steps according to our seat’ dimension and the international safety requirements of fire exits.

Regarding on the projects of telescopic grandstands, besides the above documents, please tell us the quantity of site seats, the roof height, and the ground carrying ability, and so on. We will introduce the best solution according to these documents.

We completed big projects such as Rio Olympic Games 2016, Beijing Olympic Games 2008, Copa America, Korean Formula 1, Singapore Formula 1, Southeast Asian Games, All-Africa Games, Beach handball world championships, Universiade Games, suffused with the Copa America.